Finalize construction on Rooms 3H313 and 3H319 on the 3rd
Floor of the VA SOUTHERN NEVADA HEATHCARE SYSTEM Administration Building, Bldg. 6.
Finalize construction on Rooms 3H313 and 3H319 on the 3rd
Floor of the VA SOUTHERN NEVADA HEATHCARE SYSTEM Administration Building, Bldg. 6.
Renovation of Operating Rooms at the West LA VA Campus. Existing lights and booms were removed and replaced. Work included changes to the electrical and plumbing systems, such as med gas.
Provided construction services for the VA Southern Nevada Healthcare System at the VAMC North Las Vegas. Unks Construction modified and upgraded the existing water supply and distribution system to allow a larger capacity for future building and remedy recurring issues and problems in the VAMC Campus.